Named local schemes and plans, with the responsible body and the latest stage established by the source checked. A proposal, funding announcement and completed project are different things.
Lower Bristol Road and Green Park Road
Bath Quays Links
Safer crossings and cycle lanes would connect Bath Quays Bridge to surrounding streets. Green Park Road is under construction; Lower Bristol Road is paused after contractor problems.
Partly under construction; Lower Bristol Road paused · source does not state a status date
Responsible body: Bath and North East Somerset Council
Progress, funding and source
The council page lists Green Park Road as ongoing, targeting 20 November 2026, and Lower Bristol Road as paused since May 2026. The removed pedestrian island is to be replaced with a controlled crossing.
- Cost
- Not established by the evidence checked.
- Funding
- Not established by the evidence checked.
- Area covered
- Unmapped: a verified current ward boundary or council ward statement is still needed.
No verified ward footprint is assigned.
Bath Quays Links →
Source checked 2026-10-17. A plan or announcement is not proof of completion.
How to track delivery →Norfolk Crescent, Green Park and Bath Quays
Bath River Line
Improved paths, seating and signs make the riverside easier to use. The first stage between Norfolk Crescent and Bath Quays is complete; further park improvements are planned.
First phase completed; later work planned · evidence dated 2026-03-17
Responsible body: Bath and North East Somerset Council
Progress, funding and source
The dated update confirms resurfaced paths, wider access and new seating. It identifies further Green Park work during 2026 rather than saying the entire riverside programme is finished.
- Cost
- Not established by the evidence checked.
- Funding
- A further £600,000 regional grant was awarded in January 2026; this is additional funding, not the total programme cost.
- Area covered
- Unmapped: a verified current ward boundary or council ward statement is still needed.
No verified ward footprint is assigned.
First stage of Bath River Line improvements completed →
Source checked 2026-10-17. A plan or announcement is not proof of completion.